Exit 308’s Newest Changes: A Pair of Welcomed Additions

The new I-80 changes (Credit: WNEP)

Zoe Eagon

Contributing Writer

Whether you are an ESU commuter or an ESU resident, there is no denying that I-80 is a necessity, and it is being successfully renovated to handle East Stroudsburg’s rapid growth. We already have a beautiful new University Center up and running with more to come in the space where the old University Center once stood.

ESU students will appreciate the shorter walking time soon enough, but let’s not forget about I-80 and how traveling to ESU will be so much safer with a new bridge, on and off ramps and a roundabout on Prospect Street.  

I am a commuter who travels I-80 East every weekday morning and I-80 West every afternoon or night. These past couple of years, I have witnessed firsthand how Exit 308 has changed from a nerve-wracking short exit to a longer and safer deceleration exit. 

Heading past exit 307 on I-80 East, there is a warning to drive 40 miles per hour before passing by a radar speed enforcement camera shortly after, that continues to remind drivers to slow down due to construction. Not even a mile later, Exit 308 welcomes people with its new long off ramp.

Exit 308 has finally changed into a proper road that merges with Greentree Drive as of Oct. 28. I’m not a fan of having to twist my neck almost 180 degrees behind me to watch out for cars and avoid having a blind spot, but at least the construction for Exit 308 is almost over. Greentree does have some amazing buildings to see.  

For quite a few months, Exit 308 looked like a giant hairpin from the birds-eye-view on Google Maps, but felt like driving a gentle curve. According to PennDOT, the bridge was rebuilt to satisfy vertical clearance standards. Everything feels higher up when driving over the bridge now.

The bridge on Prospect street has gone through renovations and is fully operational. They installed new lampposts and there is a nice new sidewalk for pedestrians by the hospital. Lastly, the road has been widened to add extra turn lanes. 

It is wonderful that we finally have a roundabout ramp to Prospect Street. There is a large green sign up above to helpfully warn drivers of the roundabout.

On Nov. 5, I took the new and improved on-ramp to enter I-80 West. To my pleasant surprise, it has finally changed to three lanes, so I was happy to no longer have a stop sign or have to endure cars getting backed up.

The road isn’t asphalt just yet, but the concrete is nice and smooth. I-80 East still has two lanes, but soon it will have its three lanes to match I-80 West’s three lanes.

In my opinion, many will enjoy having a normal looking on ramp without construction vehicles everywhere. The expected completion date is for 2027, according to the PA government website.




The views expressed in the Opinion section do not reflect the views of the Stroud Courier, its editorial board or East Stroudsburg University, but are solely the views of the author.